The Challenge

An international road construction equipment OEM required a cooling system for their new generation asphalt paver. The unique operating environment—proximity to hot asphalt (150°C+) and screed heating elements—demanded specialized thermal protection. Standard construction equipment cooling solutions could not handle the elevated ambient temperatures (+20-30°C above actual air), asphalt vapor contamination, and continuous 8-12 hour paving duty cycles.

Our Solution

XinSheng engineered a specialized cooling system with heat shields between cooling package and screed area, increased core sizing to compensate for elevated ambient, and dedicated fan circuit for consistent airflow. Wide fin spacing (3.5 FPI) with smooth surface finish reduces tar adhesion and enables easy cleaning. Quick-release mounting provides regular core cleaning access. High-temperature resistant tank materials and reinforced fin construction handle pressure washing.

Key Results

  • Reliable operation in ambient conditions 20°C higher than standard equipment
  • Cleaning interval extended from daily to weekly
  • Zero thermal shutdowns during 2-year field validation

Project Background

An international road construction equipment OEM required a cooling system for their new generation asphalt paver. The unique operating environment—proximity to hot asphalt and screed heating elements—demanded specialized thermal protection beyond standard construction equipment solutions.

Application Challenges

Extreme Thermal Environment

  • Freshly laid asphalt temperatures exceed 150°C
  • Screed heating elements radiate additional heat to engine compartment
  • Ambient temperatures effectively +20-30°C above actual air temperature

Contamination Exposure

  • Asphalt vapors coat heat transfer surfaces
  • Fine aggregate dust clogs fin passages
  • Regular cleaning required during paving operations

Continuous Duty

  • Paving operations run 8-12 hours continuously
  • Heat soak during material loading pauses
  • No opportunity for cool-down during production

Solution Development

Thermal Protection

  • Heat shields between cooling package and screed area
  • Increased core sizing to compensate for elevated ambient
  • Dedicated fan circuit for consistent airflow independent of engine speed

Contamination Resistance

  • Wide fin spacing (3.5 FPI) for easy vapor and dust cleaning
  • Smooth fin surface finish to reduce tar adhesion
  • Quick-release mounting for regular core cleaning access

Material Selection

  • High-temperature resistant tank materials
  • Reinforced fin construction for pressure washing durability
  • Corrosion protection for aggressive environment

Validation Program

Testing included:

  • Extended thermal testing at +60°C ambient
  • Accelerated contamination/cleaning cycle testing
  • Field validation on active paving projects

Production Implementation

Volume production commenced Q2 2024. The solution is now specified on multiple paver platforms from this OEM.


Note: Customer identity and proprietary specifications are confidential. Contact us to discuss your road machinery cooling requirements.

Industry

Construction Machinery

Similar Challenge?

Our engineers are ready to help solve your thermal management problems.

Get in Touch