Case Studies
Real Solutions for Real Challenges
Proven Solutions Across Industries
Our heat exchangers operate in the world's most demanding environments. Explore how we've helped global OEMs solve complex thermal management challenges.
Featured Projects
Mining Truck Cooling System Upgrade
High ambient temperatures and extreme dust conditions causing frequent overheating and unplanned downtime on 150-ton haul trucks
- 30% improved cooling capacity
- Extended service intervals from 500 to 2,000 hours
- 50% reduction in unplanned downtime
Excavator 30T Modular Cooling System
A leading construction equipment manufacturer needed an integrated cooling solution for their new medium excavator platform (30T class). The existing design used separate radiator, charge air cooler, and hydraulic oil cooler components, creating assembly complexity and serviceability challenges. They required 120 kW combined heat rejection in a 15% smaller package, with operation in extreme dust conditions and high ambient temperatures up to +50°C.
- Package volume reduced by 18% (target was 15%)
- Assembly time reduced by 40%
- Heat rejection capacity 125 kW (exceeded 120 kW target)
Wind Turbine Nacelle Thermal Management
Multi-circuit cooling for gearbox, generator, and converter in limited nacelle space with 20-year service life requirement
- 99.5% uptime reliability over 5 years
- Compact design fitting within nacelle constraints
- Low maintenance with 10-year service intervals
Note: Due to customer confidentiality, specific details are shared upon request with appropriate NDAs.
Have a Challenging Application?
Our engineering team thrives on solving complex thermal management problems.