Project Background

A leading mining equipment manufacturer approached XinSheng with a critical challenge: their 150-ton haul trucks were experiencing frequent overheating events in high-altitude, hot-climate mining operations. The existing cooling system was unable to cope with ambient temperatures exceeding 45°C combined with extreme dust conditions.

The Challenge

Operating Conditions

  • Ambient temperatures: 40-50°C
  • Altitude: 3,500m above sea level
  • Dust levels: Extreme (open-pit copper mine)
  • Operating hours: 20+ hours per day
  • Engine power: 1,800 kW

Problems Encountered

The original cooling system suffered from:

  1. Rapid fin clogging due to fine dust particles
  2. Insufficient heat rejection at high altitude
  3. High fan power consumption (15% of engine power)
  4. Frequent maintenance requirements (every 500 hours)

Our Solution

Engineering Approach

XinSheng’s application engineering team conducted detailed analysis including:

  • CFD simulation of airflow through the cooling module
  • Thermal performance modeling at altitude conditions
  • Fin geometry optimization for dust resistance
  • Fan selection and noise optimization

Design Features

Optimized Core Design

  • Wider fin spacing (10 FPI vs. standard 14 FPI) for improved cleanability
  • Enhanced turbulator patterns for better heat transfer
  • Single-row core arrangement for easy access

Modular Construction

  • Radiator + CAC + hydraulic oil cooler in integrated module
  • Quick-disconnect connections for field serviceability
  • Corrosion-resistant materials and coatings

Improved Airflow

  • Optimized shroud design reducing air-side pressure drop by 25%
  • Variable-speed fan control integration
  • Reduced recirculation with improved sealing

Results

After 12 months of field operation:

MetricBeforeAfterImprovement
Cooling CapacityBaseline+30%Significant
Service Interval500 hrs2,000 hrs4x longer
Unplanned DowntimeBaseline-50%Major reduction
Fan Power15% of engine10% of engine5% savings

Customer Testimonial

“The XinSheng cooling module has transformed our operation. We’ve seen a dramatic reduction in heat-related downtime, and our maintenance costs have dropped significantly. The engineering team’s understanding of our operating conditions was exceptional.”

Mining Equipment OEM, Project Lead

Products Used

This project utilized the following XinSheng products:

  • Modular Cooling Pack - Integrated radiator, CAC, and oil cooler assembly
  • Bar & Plate Oil Cooler - High-pressure hydraulic system cooling
  • Tube & Fin Engine Radiator - Primary coolant system

Applicable Industries

This solution approach is applicable to:

  • Open-pit mining operations
  • Quarry equipment
  • Large construction machinery
  • Any high-temperature, dusty environment