案例研究
真实挑战的真实解决方案
跨行业的成熟解决方案
我们的热交换器在全球最苛刻的环境中运行。探索我们如何帮助全球 OEM 解决复杂的热管理挑战。
重点项目
Mining Truck Cooling System Upgrade
High ambient temperatures and extreme dust conditions causing frequent overheating and unplanned downtime on 150-ton haul trucks
Excavator 30T Modular Cooling System
A leading construction equipment manufacturer needed an integrated cooling solution for their new medium excavator platform (30T class). The existing design used separate radiator, charge air cooler, and hydraulic oil cooler components, creating assembly complexity and serviceability challenges. They required 120 kW combined heat rejection in a 15% smaller package, with operation in extreme dust conditions and high ambient temperatures up to +50°C.
Wind Turbine Nacelle Thermal Management
Multi-circuit cooling for gearbox, generator, and converter in limited nacelle space with 20-year service life requirement