XS Cooler - Xinsheng Heat Exchanger
Excavator 30T Modular Cooling System
工程机械

30吨级挖掘机模块化冷却系统

挑战

某知名工程机械制造商需要为其新型中型挖掘机平台(30吨级)开发一体化冷却解决方案。现有设计采用分离式散热器、中冷器和液压油冷器组件,导致装配复杂性和维护困难。他们需要在缩小15%的空间内实现120千瓦的综合散热能力,并能在极端粉尘条件和高达+50°C的高温环境下运行。

我们的解决方案

鑫盛开发了三合一模块化冷却组件,将三个换热器集成到单一框架组件中。分级芯体布置针对不同温度需求进行了优化。通用水箱设计减轻了重量,消除了冷却器之间的连接。加固的安装设计和宽翅片间距(4 FPI)解决了振动和维护问题。原型机经过了全面测试,包括风洞热性能验证、振动疲劳测试和IATF压力循环测试。

主要成果

  • 封装体积减少18%(目标15%)
  • 装配时间减少40%
  • 散热能力125千瓦(超过120千瓦目标)

Project Background

A leading construction equipment manufacturer approached XinSheng to develop an integrated cooling solution for their new medium excavator platform (30T class). The existing design used separate radiator, charge air cooler, and hydraulic oil cooler components, creating assembly complexity and serviceability challenges.

Customer Requirements

  • Thermal Performance: Combined heat rejection of 120 kW (engine coolant 70 kW, charge air 25 kW, hydraulic oil 25 kW)
  • Operating Environment: Ambient temperatures up to +50°C, extreme dust conditions, high altitude operation
  • Vibration Rating: Track-induced vibration per customer duty cycle specification
  • Packaging Constraint: 15% reduction in overall package volume vs. existing solution
  • Serviceability: Easy-clean design for field maintenance in dusty environments

Engineering Approach

Phase 1: System Analysis

Our application engineering team conducted thermal and mechanical analysis of the existing system. CFD simulation identified airflow restrictions in the original multi-component layout that limited cooling capacity under low-speed operating conditions.

Phase 2: Integrated Design

We developed a 3-in-1 modular cooling pack integrating all three heat exchangers into a single frame assembly:

  • Staged core arrangement optimized for differential temperature requirements
  • Common tank design reduced weight and eliminated inter-cooler connections
  • Reinforced mounting provisions addressed vibration concerns

Phase 3: Validation

The prototype underwent comprehensive testing in our laboratory:

  • Thermal performance verified on wind tunnel
  • Vibration fatigue testing to customer specification
  • Pressure cycling and leak testing per IATF requirements

Key Success Factors

  1. Early Engagement: Involvement from concept phase allowed optimization of package layout
  2. Integrated Testing: In-house thermal and vibration testing accelerated validation
  3. DFM Focus: Design for manufacturing reduced production complexity
  4. Serviceability: Wide fin spacing (4 FPI) and hinged mounting enabled field cleaning

Production Status

The integrated cooling module entered volume production in Q4 2024 and is now installed in excavators operating across Asia and Europe.


Note: Specific customer details and proprietary specifications are confidential. Contact our engineering team to discuss similar applications.

行业

Construction Machinery

类似的挑战?

我们的工程师随时准备帮助解决您的热管理问题。

联系我们